The Great Murphy Bed Project – Update

On Monday the edge banding arrived.  I’ve spent most nights this week ironing edge banding on to the edges that will show on the bed.  Heather stained the two largest plywood pieces and now we’re ready for some serious assembly this weekend.

The goal to is to get the basic bed box built and start applying the finish.  We’re under a bit of a deadline.  Our grandkids are coming out for a visit in a couple of weeks and this is one of the beds they’ll be sleeping on so it’s important that the finish have as much time to cure as possible before they arrive.

With a little hard work I hope to be installing the bed in another week.

And I am under instructions to hurry up on this project.  Earlier this week Heather was talking to the seven-year old and told him, “Grandpa is making a bed for you to sleep in.”

“He’s making a bed? Well he’d better hurry up,” was the reply.

So there are my orders from a the youngest grandchild – got to hurry up and finish this.

I’ll post pictures in the next up date.  Not much to see right now other than a stack of stained plywood.

Posted in woodworking | Tagged , | Comments Off on The Great Murphy Bed Project – Update

I can type again – RSI Update

Just a quick follow-up on my RSI (repetitive stress injury).

Man, this takes a long time to heal.  Since I saw the doctor last month I’ve read arranged my computer workstation and it’s helped a lot.  I installed an adjustable keyboard tray and that has improved the angle at which my arms sit while I am typing.  I’ve changed to a Evoluent vertical mouse.  It’s a bit weird at first but rotating the arm 90 degrees while mousing has really helped.  Finally I got one of those split keyboards from Mircosoft – hate to admit this but this keyboard really works.  It changes the angle on my arms to a more natural position and really reduces the stress.

At work I’ve learned to use the mouse with my left hand so I don’t over use my right side but I still need to get a new keyboard for the office.

Altogether it’s working but anytime you get this it takes forever to heal.  But I hope that I’ll be able to get back to a more regular blogging schedule now that I moving past this problem.

Posted in General | Tagged , | Comments Off on I can type again – RSI Update

The Great Murphy Bed Project

We’re building a Murphy bed.  Yup, one of them beds that hangs on a wall and folds down at need.  Why?  Well, recently Heather and I remodeled the guestroom – moved some walls, built a closet, new floor, fresh paint.  It was a big project.  The idea was to make the space more usable by guests – family, including the six grand kids.  One of the last problems was beds.  There is only a single bed in the room right now and we could fit one more in but we didn’t want to take up a lot of floor space with a bed so we settled on a Murphy bed.

And of course, I declared that I could build one.  Easy.  No problem.  Just a few sheets of plywood, a little hardware, some stain and varnish and presto – Murphy bed!

Well that’s the theory.  This series of blog posts will detail the reality of the project.

The Murphy bed hardware kit

I ordered the bed hardware kit from Rockler.com (http://www.rockler.com/product.cfm?page=17212 ), one of my favorite on-line toy stores.  The kit comes with the basic hardware, plans, parts list, cut lists and even a DVD with complete video instructions.

The bed is mostly constructed from plywood – takes 4 – 4’x8’ sheets of ¾“ and two sheets of ¼” inch.  The problem I have is cutting sheet goods on my little table saw.  The DeWalt 744 is a nice, cheap little saw and I get a lot of use out of it but I don’t feel safe ripping full sized sheet goods on it (okay – I did it a couple of times, never again).

Truck full of lumber

The solution is the lumber yard.  I went to a local lumber dealer that has a milling shop.  They have good plywoods – oak, cherry and clear pine – and charge $1 per cut if you buy from them.  Now their lumber prices are a bit on the high side but for $19 they took the cut list from the bed plans and cut all the lumber to size (and they do stock high quality lumber).  The only thing I’ll cut in my shop are some trim pieces.  Frankly, I don’t get a lot of joy out of cutting sheet goods so I was willing to trade a few dollars and let them do it.  That way I’ll get to just do the stuff I think is fun, mounting the hardware, assembling the bed and doing the installation.  Heather is going to help and is doing most of the finish work. She also has a better eye for measurements than I do so she double checks the critical measurements before I start sawing, hammering, drilling or otherwise destroying good lumber.

Heather staining the uprights

It’s going to be a big project for us.  We’ve done a couple of bookcases and similar projects but this our biggest furniture project.  It is kind of scary to get into – the instruction video is an hour long, the assembly instructions go on for 30 pages and then there are 10 pages of installation instructions.

We’ve spent just under two days working on it so far (including shopping time and trips to Starbucks) and I’d say we’re just under a quarter done.

Here’s  list of stuff we’ve completed:

  • Decided on clear pine and to stain it with a cherry colored stain with a semi-gloss clear lacquer.
  • Bought the wood and had the plywood cut to size.
  • Bought the wood screws, nails, handles, stain, glue and other little parts and bits that aren’t included in the hardware kit.
  • Built the internal bed frame
  • Mounted the hardware on the side rails
  • Sanded and stained all parts except for the large face boards
  • Milled the solid cherry wood for the bed legs
  • Cleaned out part of the shop
  • Ordered the edge banding

Wow – looks like a lot when you list it like that but when you look at in the shop it still looks like a pile of random lumber.

First completed subassembly – the inner frame

I have one part still on its way – the edge banding for the plywood.  I ended up ordering that on-line and it’s due to be delivered next week.  Not having this is delaying some of the work.  Also the weather slowed us down a bit.  I don’t have a big shop space so much of the work is being done on sawhorses on the drive way – well it rained much of last weekend (hey – what happened to California sunshine?!?).  Good news is that there’s no rain in the forecast for awhile so we hope to make a lot of progress this weekend.

We’re going to work on it again this weekend.

More details in the next report.

Posted in woodworking | Tagged , | 4 Comments

A Day on the Rock

View of Alcatraz from San Francisco

Raise your hand if you’ve taken the tour of Alcatraz.  I suspect most of you have, but I’ve lived in the South Bay Area all my life and I only just saw it for the first time last weekend. Yup, 50 some years in this place and I’ve only just got around to seeing it.  Isn’t that how it works – millions of people from far away places have gone to see it but I live here and haven’t taken the time to see one of the most famous – infamous – prisons in the world.

When Heather and I were thinking about places to go for a day trip over the Memorial Day weekend it came out that I’d never been to Alcatraz.  At first I was thinking of Maritime Museum near Fisherman’s Wharf to see the old ships and maybe buy a sea shanty CD in the gift shop but then the scandal of me never having seen Alcatraz came up.  So I figured that I’d get out of it by not being able to get tickets on short notice.

Cell

A Prisoner’s Cell

There were two tickets open for the noon boat to Alcatraz on Saturday and it turns out you can get shanties on iTunes these days so it was off to the rock.

Being a Saturday I decided to brave big city driving and took the hour long drive into the city and parked at Pier 39.  After a relaxed a walk around the touristy Pier 39 we headed down for the Alcatraz boat.  You can never tell what the weather will be like out on the bay so we’ve come with light rain jackets and kept an eye on the sky so of course the sun came out and there was a gentle breeze as we boarded the boat.

Boat rides are always a concern for me as I am known to get sea sick just watching boats on TV.  The bay was calm and the trip was only about 15 minutes so I had no trouble at all.

Once on the island we saw the orientation film and headed up the hill for the audio tour of the cell block.  I highly recommend both.  The afternoon was warm and sunny so we also took a walk around the gardens.  At one time the gardens were tended by the inmates but these days there are volunteers who care for the flowers.  The gardens are worth it and it also gives you a chance to see all the birds that now call Alcatraz home.

Me coming out of the “hole” and trying to look mean.

I am a bit of a history buff and really got into reading all the information about the history of the island.  Starting in 1850 the US army used it first as a fort and then a military prison.  In 1934 it was turned into a federal prison and held prisoners until 1953.  One thing that struck me was the information about the American Indian occupation of the island from 1969 to 1971.

I also remembered one of my father’s favorite sayings: “you know you’re getting old when they are talking about things as history that you remember as current events.

I am officially old.

I remember watching the news reports of the occupation and talking about it during social studies in school.

You see it is one of the reasons I haven’t seen the island before – you couldn’t go there when I was a child.  As I get older I often find myself reading about an event and thinking where was I when that happened.  Here is a place where my life and history touched ever so slightly and I found myself thinking of my own life history as I read the information signs.

Formerly the Warden’s fireplace – now a seagull’s nest.

When I was born Alcatraz was a federal prison.

When I was three the prison was closed (the same year JFK was killed and the year of my first memories.  The first TV show I remember is “Mr. Ed” but I digress).

When I was in fourth grade the island was occupied by a group of American Indians.

In the sixth grade federal law enforcement officers removed the last occupiers.

I was in the eighth grade when it was opened to the public for the first time.

Then I was too young to care about history.

I hate to admit the number of times I’ve seen the island from the shore, the Golden Gate Bridge or even the handful of times I’ve been past it on a boat without thinking it might be good to actually visit the place.

One of the gardens

What I will say is that I am glad I finally went and set foot on the rock.   There is history there to learn and a great day out.

We ended our outing by going back to the Pier 39 and fought the crowds to get a strawberry crepe and a ham and pineapple one.  Just as we finished our treat the weather turned and it started to rain.  With the rain came the great exodus of tourists fleeing the bad weather and it took over 30 nerve wracking minutes to just to get to the freeway.

 

Note:  all photo credit goes to Heather.

Posted in General, Travel | Tagged , , | Comments Off on A Day on the Rock